Nokia RF Performance Monitoring and Opt Engineer
| CarlosA.ReyesSantis@mobile-servicesgroup.com |
Welcome to the hub of next generation network related news and progress. This website is to share knowledge and experience among ICT professionals.
| CarlosA.ReyesSantis@mobile-servicesgroup.com |
Rules during drive test:
1- Choose the site under surveying to be above the clutter and repeat types of the clutter you would be looking at.
2- Any thing with clutter less than 100 is not enough.
3- Make sure that the GPS surveying option is the same as the one used where the drive test is being performed.
4- Make sure that the Dautch value of the GPS is the same as the one set for the country where the drive test is being made.
5- Better collect data in the format of, Degrees: Decimal Points Degrees.
6- Every 6 degrees you move result is one point change in the whole picture the UK being the reference point at 30, To the left it increases and to the right it decreases.
7- Sampling rate, 40 Samples per 40 wavelengths. To reduce the effect of Radio fading.
8- Sampling can be in Distance and Time. Better do it in Distance especially if you are driving in traffic jams.
9- Do not drive away too much from the site.
10- Drive in to the Site passing through the clutter as well as crossing the clutter
11- Try and drive many roads close to the site unless the clutter is so important.
12- Try to avoid driving the same road twice.
13- Do not drive over a bridge or in to a tunnel inside a clutter area, otherwise take that parts of data a out of the data file collected for this clutter.
14- Make short calls and Long calls, Short calls is the average duration by customers, short calls are to know whether calls will survive the setup and the termination successfully, it also determines the setup time…
15- Long calls are to test the hand over capabilities.
16- Adjacent channels are channels with coverage of 9db more than the serving cell.
17- The co-channel interference is interference from channels have frequency lower the serving channel.
18- For the adjacent channel you could be served from this adjacent channel but the system can not read it and it gives the name of another channel
19- The 6 neighboring cells are those who are listed in the scan list these do not mean that these are the only channels that the phone can see.
20- You have to make sure of the values you are getting out of the surveying equipment do actually make sense.
21- Know the exact power out of the antenna, ERP level, (Effective Radiation Power).
22- Everything about the antenna conditions, during the test time should be reported in the final report.
23- Weather conditions should be reported as well.
24- Know the distance and direction of any buildings blocking your way.
25- Finally, report all sorts of problems.
TRX Test is done to check whether calls originated are being handled by all the TRX’s. Call made during the process is tracked by the MAIO number displayed on the screen for all the TRX’s.
E.g. for Site of configuration 6 TRX per sector the MAIO values for TRX test shall be 0,1,2,3,4. Call can be originated on the BCCH or the TCH frequencies. Hence MAIO values will be reflected only for calls on TCH frequency and not on BCCH frequency.
GPRS (General Packet Radio System)
This is performed to check whether GPRS is working on the Site. This is done
by browsing a web page in browser of the phone. For GPRS to be checked it is
necessary to see that the handset is WAP, GPRS enabled.
Intra Site Handover
Intra Handover is performed to check whether handover is taking place both ways
on the Site.
Handover is performed among all the Sectors of the Site.
Inter Site Handover
Inter Handover is performed to check whether handover is taking place both ways
on the Site with it’s adjacent neighbor. Handover needs to checked mandatorarily
for primary neighbor.
Handover is performed with all the defined neighbor's in the integration sheet.
MOC and MTC
Given are parameter need to be checked while performing MOC and MTC
RX Level (-47 dbm to -110dbm)
RX Quality (0 to 7)
SQI (20 to 30)
DTX
HSN (Hopping Sequence Number) (0 to 63)
MAIO
Hopping Frequency
C/ I Ratio (>15 dbm)
C/ A Ratio (>12 dbm)
Definition of Radio Parameters:
CPC (Cell Parameter Check)
Given are the parameters that need to be checked while performing CPC.
CGI (Cell Global Identity) consists if MCC+NCC+LAC+CI
BCCH Frequency
BSIC
GSM Band
Time: It is system time of computer.
CGI : It stands for the Cell Global Identity which is unique for every sector of the site. It consists of MCC,MNC,LAC,CI.
Band : It tells in which Freq. Band mobile is operating e.g. GSM 900/ 1800.
TCH ARFCN: On which Traffic Freq. call is going on.
BSIC (Base Station Identity Code) : It is combination of Network Color Code (NCC) (0 – 7) & Base Station Color Code (BCC) (0 – 7). e.g. 62. It is decoded by mobile on every Sync. Channel Message.
Mode: It is shows in which state is mobile operating, Idle, Dedicated & Packet.
Time slot: On which time slot of current TCH call is going on. Viz. time slot no. of TRX.
Channel Type: Type of channel mobile is getting now. Like BCCH / SDCCH/8 + SACCH/C8 or CBCH / TCH/F +FACCH/F +SACCH/F.
Channel Mode : Shows mode of coding like Speech Full Rate of Half Rate.
Speech Codec: It shows FR for Full Rate, HR for Half Rate & EFR for Enhanced Full Rate.
Ciphering Algorithm : It shows ciphering algorithm used by the system to protect data for privacy. E.g. Cipher by A5/2.
Sub Channel Number: It is displayed at a time when mobile is on dedicated mode at time of call setup when it is getting SDCCH at that time it shows which SDCCH it is getting out of 8 available. E.g. 2.
Hopping Channel : It shows that current sector is having hopping feature or not. Values are Yes or No.
Hopping Frequencies : It displays no. of freq. on which mobile is allowed to hop. viz. MA List for hopping of that sector.
Mobile Allocation Index Offset (MAIO): It is the number which tells from which freq. from given MA list for sector hopping has to be started. E.g. 0 means sector will start from first freq. to hop.
Hopping Sequence Number (HSN) : Indicates sequence in which frequencies are allowed to hop from the MA List. 0- 63. 0 for Cyclic Hopping, 1 – 63 random hopping sequences.
•Physical Verification
•Alarm Checking
•Frequency Plan Verification
•Hardware Configuration Verification
Physical Verification
Physical Verification is carried out by verifying physical parameter of the New Site with the TSSR (Technical Site Survey Report) such as Address, Lat, Long, Building Height, Antenna Height, Antenna Type, Orientation, Tilt.
Alarm Verification
Alarms are generated mainly due to number of reasons, and these needs to checked before Drive is being carried out for the Site. Alarms are checked from the NOC (Network Operating Centre) and if found needs to be verified before drive being carried out.
Frequency Plan Verification
Frequency Plan can be verified from the NOC (Network Operating Centre) for BCCH and TCH frequencies being implemented as per the Site Integration Sheet sent to NOC (Network Operating Centre).
Hardware Configuration Verification
Hardware verification is performed to know the Site type, BTS Type, TRX Configuration, VSWR checking , Power measurement for each TRX.
•CPC (Cell Parameter Check)
•MTC (Mobile Terminated Calls – Prepaid to Postpaid)
•GPRS
•Inter Site Handover
•Idle Drive (Normal Drive & Frequency Lock Drive)
Arrange Drive Test:
Neighbor Tuning:
DAC value Check:
When neighs are far away then chances of HO fail increases. In this case ping-pong HO takes place by which fail takes place. So if the inter distance is high its better to delete that kind of neighbour.
LAC Boundary-
Clear Reports: